Our Services
POLLUTION CONTROL BOARD ACTIVITIES
The Legal Advisors in connection with the Environmental Acts, Rules & Regulations for,
Statutory Environmental Compliance:
- Consent to Establish
- Consent to Operate
- Consent to Renewal
- Combined Consent + Biomedical Waste Authorisation
- Recycling of E-Waste Consent
- Recycling of Waste / Used Oil
- NOC of CGWA and Annual Returns
- NOC of EPR and Annual Returns
- Hazardous Waste Returns (Form No – 4)
- Environment Statement Report (Form No – 4)
- Biomedical Waste Annual Returns
- E-Waste Annual Returns
- Annual Returns Of Post Environment Clearance
FACTORY LICENCE SERVICES
THE FACTORIES ACT 1948 COMPLIANCES SERVICES
Stay Compliant, Stay Secure: Let us take care of your factory rules
- Preparation & Drafting Factory (Building) Plan & Machinery Layout According to Maharashtra Factories Rule 1963.
- Preparation & submission of Factory (Building) Plan & Machinery Layout along with Form No-1 & required Documents to Joint Director of Industrial Safety & Health (Factory Inspector).
- Follow-up & Guidance to the Employer for Complying various Provision for Approved Factory (Building) Plan & Machinery Layout from Joint Director of Industrial Safety & Health (Factory Inspector).
- Obtained & Submission Stability Certificate (Form 1-A) to submit Joint Director of Industrial Safety & Health (Factory Inspector).
- Preparation & Application for Registration of Factories (Factories License) Along with requisite Fees to Joint Director of Industrial Safety & Health (Factory Inspector).
- Preparation & Application for Renewal/Amendment of of Factory License, Factory Plan, Change the Manager, Occupier, HP, Manpower
- Safety Audit, HIRA, JSA (Job Safety Analysis Report), Fire Audits, Ventilation, Noise, Illumination Survey, Electrical Safety Audits, Examination of Lifting & Tackles & Pressure Vessels (Form No 11 & 13).
- Preparation & maintain of various Registers & Records as provide under the like Register of Adult of Workers, Register of Child Workers, Register of Leave with Wages.
- Preparation & Submission of various forms return & reports from time to time as prescribed under this act.
LABORATORY AND ENVIRONMENTAL MONITORING DIVISION
- Ambient Air
- Ambient Noise
- Workzone Air
- Workzone Noise
- DG Stack Emissions
- DG Insertion Loss
- Illumination Survey
- Ventilation Survey
- Drinking Water Analysis
- Water and Waste Water Analysis
- Soil Analysis
- Grinding Dust Analysis
WATER AND WASTE WATER TREATMENT DIVISION
Design, Supply, Maintenance, Erection, Installation and Commissioning of:
- Effluent Treatment Plants
- Sewage Treatment Plants
- Water Treatment Plants
- De-mineralisation (DM) Plants
- Ozonation Systems
- Softener Plants
- Reverse Osmosis (RO)
- DG Stacks/ Chimney
- Wet Scrubber/ Dust collectors
- ETP, STP, WTP, RO,DM, Softener,ZLD and MEE Design,Supply Installation,Erection & Commissioning Up-gradation of the Existing plant.
AIR POLLUTION CONTROL DIVISION
- DG Stack
- Wet Scrubber
- Bag Filters
- Fume Extraction System
- ETP
- STP
- WTP
- RO
- DM
- Softener
- ZLD and MEE
CHEMICAL DIVISION
Stockiest and Supplier of,
- For Water Treatments
- For RO Treatments
- For Laboratories
- For Cooling Towers, Boilers
RAIN WATER HARVESTING
- Geophysical Investigations
- Results and Data Processing of Electrical Resistivity Survey
- Geo-Magnetic Prospecting Survey
- Rainfall Calculation
- Static Water Level Distribution of the Study Area
- Review of Hydrogeological Terminology
- Water Disposal
- Field Procedures
- Results of Aquifer Performance Tests Experimentation
- Methodology: Materials & Methods for Analysis
-
Analytical Program
-
Rainwater Harvesting Feasibility Analysis
-
Rainwater Harvesting Endowment Calculations
-
Infiltration Rate and Water Holding Capacity of Recharge Pit-cum-Borehole
-
Holding Capacity of Recharge Borewells and Recharge Pits
-
Rainwater Harvesting Potential Calculations for One Day
-
RWH Pit-cum-Borewell One-Day Capacity
-
Rainwater Harvesting Potential Consideration
-
Interventions, Recommendations & Conclusions
-
Aquifer Mapping, Recharge & Discharge Area Identification
-
Materials Used to Fill the Recharge Pit
-
Proposed Location of Pit-cum-Recharge Borewells
Ready to Build a
Cleaner, Greener Tomorow ?